I need a solution
Hi All,
Currently we are running two SEPM servers with version 11.0.6. We can called these servers as A & server B.
We are planning to install new windows 2008 R2 server & configured SEPM v12.1. We can called as server C.
Server A & B having around 1500 SEP clients running with version 11.0.6.
I need correct & easiest steps to move these clients to newly configured SEPM v12.1 with all existing configuration .
Thanks in advance!